The Cyber Resilience Act does not apply all at once. Regulation (EU) 2024/2847, published in the Official Journal on 20 November 2024, phases in its obligations over three key dates set by Article 71. Today is 30 September 2026: two of them have passed, and one of those directly affects every manufacturer. Here is what applies, what the Article 69 transitional regime changes, and what to do at each stage.
Overview
| Date | Provision | Who is affected | Status at 30 Sept 2026 |
|---|---|---|---|
| 11 June 2026 | Chapter IV (Articles 35 to 51): notification of conformity assessment bodies | Member States, notified bodies | Applicable |
| 11 September 2026 | Article 14: reporting of actively exploited vulnerabilities and severe incidents | All manufacturers, including for products already on the market | Applicable for 19 days |
| 11 December 2027 | General application: essential requirements, technical documentation, conformity assessment, EU declaration, CE marking | Manufacturers, importers, distributors | Upcoming |
11 June 2026: notified bodies
This deadline mostly concerns the assessment ecosystem. Chapter IV sets up the designation and notification of the bodies that will carry out conformity assessments for "important" class I products (outside self-assessment), class II and critical products. A small manufacturer files nothing, but the date determines whether bodies capable of issuing the certificates you may need will exist when you need them.
To do: if your product could fall under an Annex III or IV category, identify now which notified body could handle it and plan for lead times. See our guide to product classification.
11 September 2026: reporting is already mandatory
This is the deadline that matters today. Since 11 September 2026, Article 14 requires the manufacturer to report:
- any actively exploited vulnerability in one of its products;
- any severe incident having an impact on the security of a product.
This obligation applies to all products already on the market, even those sold years before general application. The ENISA Single Reporting Platform (SRP) opened on the same day.
The deadlines are:
| Stage | Actively exploited vulnerability | Severe incident |
|---|---|---|
| Early warning | 24 hours | 24 hours |
| Notification | 72 hours | 72 hours |
| Final report | 14 days after a corrective measure is available | 1 month after the notification |
The clock starts at awareness, not at full confirmation.
To do this week:
- Name a person responsible for reporting, and a deputy.
- Publish a security contact (security.txt generator) and a disclosure policy.
- Prepare your account on the ENISA platform and identify your coordinating CSIRT.
- Try the reporting clock on a fictional case.
- Map your third-party components so you know whom to inform.
For micro and small enterprises (fewer than 50 staff, turnover or balance sheet of EUR 10 million or less), missing the 24-hour deadline alone does not lead to a fine (Article 64(10)(a)). The duty to report remains in full. Details are in the practical guide to ENISA reporting.
11 December 2027: general application
From this date, every product placed on the market must meet:
- the essential requirements of Annex I (Parts I and II);
- the conformity assessment of Article 32;
- the technical documentation (Annex VII);
- the EU declaration of conformity (Annex V) and the CE marking;
- the information and instructions of Annex II.
To do between now and then, in a reasonable sequence:
| Period | Actions |
|---|---|
| Q4 2026 | Scope, role, classification, risk assessment |
| H1 2027 | Gap analysis against Annex I, automated SBOM, support policy (5 years minimum) |
| H2 2027 | Technical documentation, testing, conformity assessment, notified body if needed |
| Q4 2027 | EU declaration of conformity, CE marking, user instructions, final review |
The CRA Compliance Kit follows this path in a roadmap to 11 December 2027, with the matching document templates.
Transitional regime (Article 69)
Article 69 deals with products already on the market. The principle: products placed on the market before 11 December 2027 are subject to the regulation's general requirements only if they undergo a substantial modification from that date.
In practice:
- A product sold before 11 December 2027 does not have to be brought into conformity retroactively, as long as it is not substantially modified.
- A product placed on the market from 11 December 2027 must comply, even if it is a new unit of an older model.
- A major update that changes the product's behaviour, its cybersecurity risks or its intended purpose may amount to a substantial modification and move you into the full regime.
- The transitional regime does not suspend Article 14: reporting has applied to older products since 11 September 2026.
To do: for each product, record the date of last placing on the market and the planned changes. Avoid scheduling a major overhaul without assessing its impact on the substantial-modification test.
Penalties: what is at stake
Article 64 provides for fines of up to EUR 15 million or 2.5% of worldwide turnover for breaches of the essential requirements and of Articles 13 and 14, up to EUR 10 million or 2% for other obligations, and up to EUR 5 million or 1% for inaccurate information. Micro and small enterprises have a limited carve-out for the 24-hour deadline, and open-source stewards cannot be fined.
FAQ
Is the CRA already applicable?
In part. Article 14 (reporting) has applied since 11 September 2026 to all products, including those already sold. The manufacturer's other obligations apply from 11 December 2027.
My product was sold in 2025: must I bring it into conformity?
Not unless it is substantially modified after 11 December 2027 (Article 69). You must, however, already comply with the Article 14 reporting duty for that product.
What happens if I miss the 24-hour deadline?
Reporting is still mandatory and must be done without delay. For a micro or small enterprise, missing the 24-hour deadline alone does not lead to a fine, but the 72-hour deadline and the final report still apply.