It is 30 September 2026. Article 14 of the Cyber Resilience Act (Regulation (EU) 2024/2847) has applied since 11 September 2026, and ENISA's Single Reporting Platform opened the same day. General application (essential requirements, technical documentation, EU declaration, CE marking) arrives on 11 December 2027, a little over fourteen months away. This checklist organises the work into six workstreams, with a quarter-by-quarter plan and the list of documents to produce.
Before starting, confirm that you are in scope and in which role: the Am I in scope? tool gives your status (manufacturer, importer, distributor) and the likely class of your product. Products placed on the market before 11 December 2027 are subject to the general requirements only in case of substantial modification (Art. 69), but Article 14 already applies to all.
Workstream 1: governance
- [ ] Appoint a CRA lead (even part-time) and a deputy.
- [ ] List the products, versions and components you distribute, with your role (manufacturer, importer, distributor).
- [ ] Classify each product: default, important class I or II, critical (Annexes III and IV), applying the core functionality test.
- [ ] Decide and document the conformity assessment procedure (module A, B+C, H, certification).
- [ ] Set and publish the support period (at least 5 years, or the expected use time if shorter).
- [ ] Set up a decision log.
Workstream 2: reporting (Article 14, already in force)
- [ ] Write a reporting procedure: who decides, who notifies, how the clock starts at awareness, not at confirmation.
- [ ] Get access to the ENISA Single Reporting Platform and identify the competent coordinating CSIRT (State of main establishment; outside the EU, Art. 14(7)).
- [ ] Prepare three templates: early warning (24 h), notification (72 h), final report (14 days after a corrective measure is available for a vulnerability; 1 month after the notification for a severe incident).
- [ ] Plan communication to users (Art. 14(8)) and to component maintainers (Art. 13(6)).
- [ ] Run a dry-run exercise. The reporting clock computes the deadlines.
Workstream 3: vulnerabilities and SBOM
- [ ] Publish a single contact point: security.txt and a coordinated disclosure policy.
- [ ] Generate a machine-readable SBOM, at least for top-level dependencies, for each release.
- [ ] Monitor known vulnerabilities in dependencies and set an internal fix deadline.
- [ ] Test regularly (dependency scanning, security testing) and keep the results.
- [ ] Publish fixed vulnerabilities and distribute patches free of charge, separate from functional updates.
- [ ] Keep patches available for at least 10 years or until end of support, whichever is longer.
Workstream 4: product security (Annex I, part I)
- [ ] Write the product's cybersecurity risk assessment.
- [ ] Check each essential requirement: secure-by-default configuration, no known exploitable vulnerability, access control, encryption, integrity, data minimisation, availability, logging, secure data deletion, secure updates.
- [ ] Handle gaps: fix, compensating measure or documented justification of non-applicability.
- [ ] Provide secure automatic updates, with an opt-out where applicable.
Workstream 5: conformity and documentation
- [ ] Build the technical documentation (Annex VII, 8 headings), in the simplified format if you are an SME (Art. 33).
- [ ] Carry out the chosen conformity assessment; contact a notified body early if you are in class II, or class I without a covering standard.
- [ ] Draft the EU declaration (Annex V), full or simplified (Art. 28(2)).
- [ ] Prepare the CE marking (Art. 30): on the product, or for software on the declaration and the website.
- [ ] Write the user information (Annex II) and display the support period at purchase.
- [ ] Set up 10-year archiving. Details in our guide on proving conformity.
Workstream 6: suppliers and components
- [ ] Inventory third-party components, open source included (Art. 13(5)).
- [ ] Ask suppliers for their SBOM, vulnerability policy and support period.
- [ ] Put vulnerability notification and access-to-conformity-information clauses into contracts.
- [ ] Replace abandoned components or those with no reporting channel.
- [ ] For an importer or distributor: check the manufacturer's CE marking, EU declaration and documentation before placing on the market.
Quarter-by-quarter plan
| Quarter | Goal | Deliverables |
|---|---|---|
| Q4 2026 | Reporting operational, scope confirmed | Reporting procedure, ENISA platform access, product register and classification, security.txt, disclosure policy |
| Q1 2027 | Inventory and vulnerability handling | SBOM per product, dependency monitoring process, support period decided, supplier inventory |
| Q2 2027 | Risk assessment and essential requirements | Risk assessment, Annex I matrix, gap remediation plan, module choice |
| Q3 2027 | Remediation and technical file | Gaps closed, tests, technical documentation v1, request to a notified body if required |
| Q4 2027 | Finalisation | EU declaration, CE marking, user information, archiving, internal review before 11 December |
If a notified body is needed, book its capacity from Q1 2027: lead times can lengthen as the deadline nears.
Documents to produce
- Product register and classification
- Article 14 reporting procedure and templates
- security.txt and disclosure policy
- SBOM per release
- Cybersecurity risk assessment
- Annex I compliance matrix
- Technical documentation (Annex VII)
- Test reports
- EU declaration of conformity
- User information (Annex II)
- Support and end-of-life policy
- Supplier register and contract clauses
The CRAdone kit provides templates for each of these documents.
FAQ
Where should I start if I only have a week?
With reporting: it is the only obligation already enforceable. Procedure, templates, public contact point. The rest can follow the quarterly plan.
My product is already on the market: do I have to redo everything by 11 December 2027?
Products placed on the market before that date are subject to the general requirements only in case of substantial modification (Art. 69). Article 14, however, already applies to all products.
Do I need a notified body?
By default no: self-assessment (module A). It becomes necessary for class II, and for class I when no standard or specification fully covers the requirements. Free software in Annex III may stay on self-assessment if its technical documentation is public (Art. 32(5)).
Take action
Check your scope with the free check, then structure your compliance with the compliance kit: 14 bilingual documents (16 with the Team Kit), ENISA reporting playbook, roadmap to 11 December 2027.